Geothermal,Seismic,Geo-Technical,Directional,Enviormental,Utilities Geo Projects  
 Geothermal  Home Page

Denison Montessori Elementary School

Denver Colorado, Science & Library Addition 6,000 sq.ft.  20-250' Vertical Loops.

3.png             Vertical Bore Hole


 



  
  
              Loading the Loop

             Conductivity Testing







1.png
           Testing the Bore Hole
  Trenching the Bore Holes Together




71.png

 

          5 Bore Holes per Circuit
   Running the Supply & Return Lines



101.png




       10 - 2'' Supply & Return Lines

 

 

 

img1721.png

 

 

         

         Reverse Return Header

 91.png

 

 

 

 

   Sweeping Supply & Return Lines

 12.png

 

 

 

    Extending Supply & Return Lines

 131.png








         Flushing the Loop Field

Duschense High School

Duschense Utah 4-300' Vertical bore holes, 47-300' Horizontal bore holes under the football field and 5-60' Water Wells. 

This project was extremely challenging. After drilling 4-300' Vertical bore holes it was determined that the drilling conditions were so tough that there was no way to effectively drill this project within the budget allowed. We then brought in one of our directional drills and drilled 47-300 foot loops under the football field at a depth of 8-14', bringing the project in on budget and on time. 

   

 

 

directional drill.png

 

 


Directional Drill Starting To Bore

 football field.png








Bore Path 8-14' Under Football Field

 

drill head exit.png

 

 

 


Drill Bit Exiting The Ground
330' From Start of Bore











Loop Pipe Hooked up
Ready to Pull Back to the Drill 




loop pulled in.png







        Loop Pipe Pulled Back to Drill

 trench.png









Trench & Header Pit
Horizontal Loop's on the Right

 

pressure tests.png

 

 




 Pressure Testing

 side saddle.png






 

Side Saddle Fusing

 

 

 

wall penatration.png

 

 


Wall Penetration

 undisturbed1.png








       
No Damage to Football Field

reamer 11.png

Tabiona High School

Tabiona Utah  80-325' Horizontal bore holes under the football and baseball field.

This project is currently under way. 

Completed Projects

Denison Montessori School
Denver, Colorado
Science & Library Addition
6000 Sq.Ft.
20-250' Vertical Bore Holes

  Duschense High School
  Duschense, Utah
Addition To School 55,000 Sq.Ft.
4-300' Vertical Bore Holes
47-300' Horizontal Bore Holes

Heart Center
Torrington, Wyoming
Childrens Heart Clinic
12,000 Sq.Ft.
30-120' Vertical Bore Holes

Indian Hud Housing
Ft.Duschense, Utah
10 Residential Houses
1500 Sq.Ft. Per House
10-500'/750' Vertical Bore Holes

 Private Residents
 Belleview, Washington
20,000 Sq.Ft.
25-300' Vertical Bore Holes

 Highway Rest Stop Information Center
Lusk, Wyoming
2,500 Sq.Ft.
6-200' Vertical Bore Holes

Cary Smith's House 
Roosevelt, Utah
Sound Geothermal
5,000 Sq.Ft.
5-250' Vertical Bore Holes
Owner Sound Gt.

 Randy Sober's House
Douglas, Wyoming
Douglas Exploration
7,500 Sq.Ft.
9-325' Vertical Bore Holes
General Manager-Douglas Exploration

Desert Generation & Transmission 
Salt Lake City, Utah
Office Building
30,000 Sq.Ft.
35-200' Vertical Bore Holes

Lake Madison Project
Seattle, Washington
Private Retreat
30,000 Sq.Ft.
45-300' Vertical Bore Holes

Fort Bliss Military Base
Ft.Bliss, Texas
Military Family Housing
1,200-1,500 Sq.Ft. Each Unit
270-320' Vertical Bore Holes

Centerpoint High School
Centerpoint, Iowa
New High School
65,000 Sq.Ft.
100-150' Vertical Bore Holes

Belleview Collage
Belleview, Washington 
Library Addition
35,000 Sq.Ft.
100-300' Vertical Bore Holes

 Indian Hud Housing
Ft.Duschense, Utah
5 Duplexes for the Elderly
12,000' Sq.Ft. Total
20-250' Bore Holes

 

 

 

 

 

 

 

 


Geothermal | Home Page




Go Daddy Software